Chicago Department of Transportation (CDOT): Walk to Transit Series I & II / II W-0-013, Specification No: 134012 Construction Inspection Services.
(click on image to download .PDF)
Project Description
The Chicago Department of Transportation (CDOT) Walk to Transit I-II project proposes pedestrian improvements around ten Chicago Transit Authority train stations. This project is federally, and state funded through the Congestion Mitigation and Air Quality (CMAQ) program. Its purpose is to promote walking to transit and shift trips away from driving by integrating pedestrian safety measures in the immediate station area and reducing pedestrian and traffic crashes. Stations were prioritized based on crash data and community factors to address goals of the Chicago Pedestrian Plan: safety, connectivity, livability, and health. The attached maps outline each site location and proposed improvements.
4HD, Inc Role4HD, Inc. will provide phase III services to the CM and assist CDOT engineers/technicians on this project throughout Chicago streets and train stations area. 4HD, Inc.'s staff duties will include inspection and documentation of pay quantities and field supervision of all daily construction activities. Staff will generate daily field inspection reports and documentation of production quantities for progress payments. 4HD, Inc.’s work also included filling out CDOT report, mark down location, drawing of street intersection, with ramps, apron, sidewalk and other strain station facilities that need improvement and work on by contractor. The scope of work also included verifying contract quantities, daily inspection reports and safety plan compliance. 4HD, Inc. will provide phase III services to the CM and assist CDOT engineers/technicians on this project throughout Chicago streets and train stations area. 4HD, Inc.'s staff duties will include inspection and documentation of pay quantities and field supervision of all daily construction activities. Staff will generate daily field inspection reports and documentation of production quantities for progress payments. 4HD, Inc.’s work also included filling out CDOT report, mark down location, drawing of street intersection, with ramps, apron, sidewalk and other strain station facilities that need improvement and work on by contractor.