IDOT PTB 194. Item 17. Job No. C-91-311-15, I-90 at I-290/Congress Parkway (Jane Byrne Interchange) I-90/94 (SB): Roosevelt Road to Lake/Madison Street, Phase III Construction Inspection Services, Cook County, Region One/District One.
(click on image to download .PDF)
Project Description
4HD Inc provided Phase III engineering construction inspection services for the improvement of -I-90 at I-290/Congress Parkway (Jane Byrne Interchange) – I-90/94 (SB): Roosevelt Road to Lake/Madison Street. Work includes, but is not limited to, the total reconstruction of the Kennedy Expressway (I-90/94) Southbound mainline to 4 through lanes between Roosevelt Road and Lake and Madison Streets in the City of Chicago using Continuously Reinforced Concrete Pavement (CRCC). For the mainline lanes and Portland Cement Concrete Jointed Pavement (PCC) for the ramps and tapers, construction of one new concrete retaining wall, resurfacing the transition area at the north end of the expressway reconstruction limit in the SB direction, construction of a two-lane Collector Distributor (C-D) roadway with shoulder within the limits of the project along the west side, overhead signing, roadway lighting, ITS, drainage & pavement markings. The work also includes special waste cleanup within the Accident Investigation Site (AIS) and other areas within the project limits and construction of an underground detention storage facility underneath the AIS near the Cermak Pumping Station, and all incidental and collateral work necessary to complete the improvement. In this project, the structure included S.N. 016-1823 – (New retaining wall along southbound direction of I-90/94 Expressway along the west side just north of Monroe Street).